Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.provenanceComisión de Investigaciones Científicas-
dc.contributorRubiales, Aldo José-
dc.contributorRisso, Miguel Atilio-
dc.contributorMayorano, Fernando Javier-
dc.contributorLotito, Pablo Andrés-
dc.creatorRubiales, Aldo José-
dc.creatorRisso, Miguel Atilio-
dc.creatorMayorano, Fernando Javier-
dc.creatorLotito, Pablo Andrés-
dc.date2012-
dc.date.accessioned2019-04-29T15:59:44Z-
dc.date.available2019-04-29T15:59:44Z-
dc.date.issued2012-
dc.identifierhttp://digital.cic.gba.gob.ar/handle/11746/4091-
dc.identifierDocumento completo-
dc.identifier.urihttp://rodna.bn.gov.ar:8080/jspui/handle/bnmm/306402-
dc.descriptionSolving the Short Term Hy- drothermal Coordination Problem considers the resolution of both the Unit Commitment and the Economic Dispatch for thermal and hydraulic units. This problem is solved for several time horizons between a day and a week with a one-hour step. The traditional short-term scheduling problem of hydrother- mal units, minimizing fuel cost during a time, does not include concerns due to emission pol- lution coming from the operation of thermal plants. In this work, environmental constraints are considered. Focusing on avoiding post- dispatch corrections, the transmission network is modeled with a high level of detail consid- ering an AC power ow. These facts lead to a very complex optimization problem which is solved by using a novel decomposition approach based on Generalized Benders Decomposition and traditional, well-known optimization tech- niques. The approach presented in this work allows the decomposition of the whole problem in a quadratic mixed integer master problem, and in a separable non-linear subproblem. The former de nes the state and the active power dispatched by each unit whereas the latter de- termines the reactive power to meet the electri- cal constraints through a modi ed AC optimal power ow. Di erent variations of the devel- oped methodology were evaluated in order to consider environmental constraints. These ap- proaches were applied to a 9-bus test case and to a 87-bus real system.-
dc.formatapplication/pdf-
dc.formatp. 413-425-
dc.languageeng-
dc.publisherUNS Printing Office-
dc.rightsinfo:eu-repo/semantics/openAccess-
dc.rightsAttribution-NonCommercial 4.0 International (BY-NC 4.0)-
dc.sourcereponame:CIC Digital (CICBA)-
dc.sourceinstname:Comisión de Investigaciones Científicas de la Provincia de Buenos Aires-
dc.sourceinstacron:CICBA-
dc.source.urihttp://digital.cic.gba.gob.ar/handle/11746/4091-
dc.source.uriDocumento completo-
dc.subjectCiencias de la Computación-
dc.titleShort term hydrothermal coordination problem considering environmental concerns-
dc.typeinfo:eu-repo/semantics/article-
dc.typeinfo:eu-repo/semantics/publishedVersion-
dc.typeinfo:ar-repo/semantics/articulo-
Aparece en las colecciones: Comisión de Investigaciones Científicas de la Prov. de Buenos Aires

Ficheros en este ítem:
No hay ficheros asociados a este ítem.